Important remarks

1, Pleas read this instruction manual carefully before installatio

2, This system should be installed by professional electrician, all tasks must meet your local electric requirements.

 

1.Select proper electronic product.

According to your local voltage, select a proper electronic product which meets your local standards, our company offer 110V/60Hz、220-240V/50Hz transformer, electromagnetism valve, relay and mist free products for different customers.

2.Installation

2.1 Electromagnetism valve’s design and specification: 3/4″, inner screw thread design, we offer it according to your local standards.

2.2 Put the electromagnetic valve, transformer and relay into a suitable place.

2.1 decide the electromagnetic valve’s position. In order to make use of the electromagnetic valve completely, control one or more fog free mirror in the meantime, we suggest installing the electromagnetic valve in the position shown on the following drawing ( drawing of the whole system Ⅱ), and parallel connect the defoggers like the electric circuit has shown.

2.2.2 put the transformer, relay onto a suitable place, according to rooms real situations, parallel connect the transformer and relay in a proper position that would be convenient to connect power.

 

Installation

 

3. Electromagnetic valve Installation

 3.1 Electromagnetic valve and the hot water pipe connection

 According to the water flowing direction in the pipe, connect the electromagnetic valve in-water end with the hot water pipe out-water end, and connect the electromagnetic valve out-water end with the hot water in-water end. There is outer thread connection requested between water pipe and electromagnetic valve, and connection interface should be well treated with water Leak-proofing.

3.2 Electromagnetic valve and transformer connection.

Connect one end of the electromagnetic valve with the positive pole of the transformer, and another end with the “3+” port on the positive pole of the relay’s input , the “4-“port on the relay input should be connected with the negative pole of the transformer, this resulted in a closed circuit.

4.Transformer Installation

4.1 Installation location: We suggest installing the relay and transformer near other electrical fixture switch in the bathroom, or near the main switch of the room.

4.2 Please install and fix the transformer to the covered in-wall junction box.

4.3 Circuit connection: the power supply is 110-230v AC, please connect power with transformer input. The transformer’s output is 24V DC, the output ports are connected with electromagnetic valve and Relay respectively. Please refer to The Electromagnetic valve, Relay and Transformer installation for details.

5.Relay Installation:

5.1 Installation location: we suggest installing the relay and transformer near other fixture switch in the bathroom.

5.2 Please fix the radiator of relay with screw onto the wall that has wire sink, then fix the relay to the radiator’s panel.

5.3 The Relay in this system has 4 wiring points, #1,#2 wiring point are for output, #3,#4 are input points. The closed circuit can be formed in the following two methods:

Method 1:

connect the #1 wiring point of relay with power supply, the #2 with fog free mirror live line, then connect the neutral line of the fog free mirror to the neutral line of the power supply

Method 2:

connect the #2 wiring point of relay with power supply, the #1 with fog free mirror positive line, and then connect the neutral line of the fog free mirror to the neutral line of the power supply.

  

 

Fix fog free mirror onto the wall:
1, Junction box location: please fix the power supply and junction box in the place shown on the drawing.
2, Mirror support panel: In order to utilize heat energy more effectively, usually apply a 9-18mm thickness plywood panel to support the mirror from wall, In installation situation, the cable lead of defogger may have some surplus length after finished the cable connection. Then we suggest opening a hole on the plywood panel as shown the drawing to hold the cable so that mirror is stable and flat after installation.
3, Cable connection: there is no live pole & neutral pole difference on defogger's cable, connect the cable with power supply by connector.
4, fix the mirror on wall: apply some neutral silica glue to the plywood panel, and place mirror to the designated position.

 

 

 

Wire to power supply

1 When apply the energy saving fog free mirror system, the connection of the whole electric circuit should be conformed to your local electric principles according to the above instructions. Otherwise the system doesn’t work.

2 When apply the fog free mirror only without energy auto saving system, the fog free mirror can share the same switch with the mirror light, or set a separate switch.

 
Top>>  
 Print】 【close  

Company:Shanghai Bagen Electronic & Technology CO.,LTD
TEL:86-21-5090 7817, 5090 9037 | FAX:86-21-51357376 | E-mail: bagen@yashdefogger.com
2004 Shanghai BAGEN.All Rights Reserved  沪ICP备05052937号
   ??--??????! ??--??????!